Product limits, compliance wording, shipping documents and commercial terms — the questions procurement and engineering teams ask before a BBU program starts, collected in one place.
The same six steps run every program, from a single-rack pilot to a hyperscale rollout. You always know which step you are in and what unblocks the next one.
Send rack architecture, load profile and bridge-time target. Engineering replies with a feasibility read within 48 hours.
Alignment on voltage, capacity, enclosure, protocol and compliance targets, closed out as a drawing-based specification.
Engineering samples built on the production line, shipping with test data from the same QC chain as mass production.
You run integration and field-simulation tests; we iterate on BMS settings and mechanics until the numbers hold.
A pilot batch proves packaging, document pack and Class 9 logistics before any volume commitment.
Volume builds with per-batch QC records, confirmed lead times and a fixed document pack on every shipment.
The commercial baseline we quote from. Project-specific terms are confirmed in writing on the quotation itself.
| Item | Terms |
|---|---|
| Incoterms | FOB Shenzhen / FOB Ningbo standard; CIF and DDP negotiable for EU and US destinations |
| Sample lead time | 2 to 4 weeks after specification freeze |
| Mass-production lead time | 4 to 8 weeks per batch, confirmed at order placement |
| MOQ | 10 to 50 units for BBU modules depending on model; engineering samples supported for qualified projects |
| Transport class | Class 9 lithium batteries — air: IATA PI965 / PI966; sea: IMDG |
| Shipping document pack | UN 38.3 Test Summary (on request) + MSDS + Class 9 documentation + drop test report |
| Custom work (OEM / ODM) | Structure, BMS and branding changes quoted as project NRE plus unit price; MOQ set per project |
| Warranty | 5-year standard warranty; cycle-based terms stated in the product warranty sheet |
| Traceability | Serial numbers bound to batch records; per-batch QC data retrievable on request |
FIG.F2 — Commercial baseline for 2026 orders; final terms as stated on the quotation
Written the way we would want them answered on an audit. If yours is missing, send it — engineering replies within 48 hours.
If your question is not on this list, email it with your rack architecture attached. Engineering replies within 48 hours — and good questions usually end up on this page.
Tell us your rack architecture and bridge-time target. Engineering reply within 48 hours, sample units available for qualified projects.