A sampling of programs running VoltBridge hardware, described by type, region and scale. Client names stay under NDA — the numbers below are deployment scales, not marketing projections.
Representative deployments; details under NDA. Each entry names the hardware, the region and the scale actually deployed.
2,400 x VB-5125 across 200 AI racks, delivered in phased batches matched to rack integration. Modules bridge each rack bus while upstream power stabilizes, keeping training jobs alive through grid events.
480 x VB-5125 installed into live colocation rows during migration windows. Legacy strings retired row by row, so customer SLA exposure never extended past a scheduled window.
90 x VB-E3 as per-node bridge in unattended edge sites. The sub-millisecond transfer carries nodes through grid instability and generator handoff with nobody on site to reset them.
1,200 x VB-5125 on -48V boards per ETSI EN 300 132-2, at hybrid sites pairing batteries with generators. Batteries take the fast transients; gensets are spared for the long hours.
36 x VB-5125 bridging an on-campus HPC build-out where the grid connection waits in the interconnection queue. The bank protects compute runs through source switching on a constrained feed.
24 x VB-H400 on a ±400VDC evaluation bay, validating the 800VDC-ready architecture and reviewing UL 9540A test data ahead of wider rollout.
Representative deployments; details under NDA
The North America hyperscale program ships in batches, not a single wave. Each batch is commissioned rack by rack: parallel groups set in BMS configuration, CAN addressing mapped into DCIM, and protection-response checks run against the site's own procedures before a rack takes live load.
FIG.P3 — Container-scale AI deployment, shown without site-identifying detail
Quotes are shared by role with permission; names and sites stay under NDA.
Bridged 14 grid events in 12 months, zero dropped racks.Head of DC Operations — EU colocation
Commissioning held to the migration-window schedule — 200 racks handed over without a slipped window.Program Director — US hyperscale cluster
The document pack was audit-ready on arrival: test summary, MSDS, transport papers, batch records.Procurement Lead — SEA edge network
Tell us the rack count, load profile and destination market. We come back with a configuration, a lead time and the same document discipline these programs run on.
Tell us your rack architecture and bridge-time target. Engineering reply within 48 hours, sample units available for qualified projects.
VB-5125 · VB-E3 · VB-H400
Fields marked * are required. Your details stay confidential.